Leak detection supervision on crude oil pipeline. After experience in Western Slovakia, customer extends the system further towards Eastern border, with the aim to cover the whole pipeline with the leak detection system. The challenge of this project was the permanent slack situation on top of environmentally sensitive area. The pipeline consists of 2 interconnected parallel pipes, diameter 500 and 700 mm. PipeMan is integrated with the large SCADA system based on Citect by Ci Technologies, Ltd. (Australia).
LEAK DETECTION FOR DRUZHBA PIPELINE, EASTERN PART
Transpetrol a.s., Slovakia

